Paul Eastham's RV-9A

11/17/2003

5 hours: With the HS nose ribs done on the left side, it's finally time to start putting this thing together. I started out by riveting the ribs onto the spar and building another stand to hold both sides of the spar.

Then I clecoed on the skin. The HS is still being very stubborn to fit together without any misaligned holes...it took a long time and a lot of manhandling but I think it is ready to rivet now.

Previous Entry  Next Entry