Paul Eastham's RV-9A

12/8/2003

6 hours: The rudder needs to cure for a couple days, so it's on to the left elevator. This is pretty much like the right elevator except there is a cutout for the trim tab.

Parts deburred, ribs fluted, counterweight attached and parts drilled.

Previous Entry  Next Entry